From: Symbol spotting for architectural drawings: state-of-the-art and new industry-driven developments
Method
P
R
F
RecR
AveP
Proposed
TH = 0.950*
0.989
0.947
0.968
97.00%
0.00
TH = 0.925
0.986
0.962
0.974
97.60%
2.40
TH = 0.900
0.985
0.977
0.981
98.30%
2.60
TH = 0.875
0.983
0.992
0.987
100.00%
3.60
TH = 0.850
0.966
0.979
4.30
Nayef and Breuel [57], as reported in [5]
0.620
0.990
0.760
99.31%
18.75